Back to top

UltraPly TPO

Firestone's installation standards are specified in a comprehensive installation guide including detail drawings.

Installation guidelines

The information provided within the Installation Guidelines may assist contractors to install the Firestone UltraPly TPO Systems in accordance with Firestone's specifications. It may also help contractors and designers to inspect the completed installation. The installation manual has been split up into different phases, which appear in a chronological order:

  1. Membrane Installation (PDF)
  2. Membrane Welding (PDF)
  3. Base Tie-in (PDF)
  4. Wall Flashing (PDF)
  5. Corners (PDF)
  6. Pipe Penetrations (PDF)
  7. Drains and Scuppers (PDF)
  8. Expansion Joints (PDF)
  9. Roof Edges (PDF)
  10. Wall Terminations (PDF)
  11. Membrane Repair (PDF)
  12. Miscellaneous (PDF)

For a complete overview of the Installation details, consult the TPO Technical Guidelines, chapter 3 (PDF).

Detail drawings

Each installation phase is illustrated in the above manual with one or more 3-dimensional drawings. The contractor may also consult the 2- and 3-dimensional illustrations by clicking the link below or go to the Detail Drawings section.

TPO Technical Guidelines, chapter 5 (PDF).