Back to top

Ikea

Larissa, Greece
  • UltraPly TPO
Mechanically Attached System (MEC)
20.000 m²

Korea Life Warehouse

Incheon, South Korea
  • UltraPly TPO
Mechanically Attached System (MEC)
9.600 m²

Intel

Dalian, China
  • UltraPly TPO
MEC + Ballasted
70.000 m²

Wembley Arena

London, United Kingdom
  • UltraPly TPO
Fully Adhered System (FAS)
10.000 m²

DDPP

Seoul, South Korea
  • UltraPly TPO
MEC + Ballasted
20.000 m²

Carrefour

St.-Malo, France
  • UltraPly TPO
Mechanically Attached System (MEC)
14.000 m²

Exhibition Theme Pavillion

Yeosu, South Korea
  • UltraPly TPO
Fully Adhered System (FAS)
4.000 m²

MKZ

Regensburg, Germany
  • UltraPly TPO
MEC + PV panels
8.500 m²

Goodman (Duvel)

Puurs, Belgium
  • UltraPly TPO
Mechanically Attached System (MEC)
40.000 m²

Forty Avenue

Wembley, United Kingdom
  • UltraPly TPO
Fully Adhered System (FAS)
2.500 m²

Mango Logistical Center

Barcelona, Spain
  • UltraPly TPO

Betek Paint Factory

Kocaeli, Turkey
  • UltraPly TPO
Mechanically Attached System (MEC)
27.000 m²